Market · Egypt

Spare parts for seawater desalination plants in Egypt

Alisios supplies genuine spare parts for seawater reverse osmosis plants in Egypt: Energy Recovery PX pressure exchangers, membranes, pressure vessel parts and high-pressure pump kits. We quote in English or Arabic within 4 business hours and prepare the documents Egypt's advance cargo system requires.

125
desalination plants operating
1.3 million m³/day
combined capacity

Updated: October 2026

Request for quotation
Send the part number or a photo of the nameplate.
Reply within 4 business hours.
+ Add part number, quantity or a nameplate photo (optional)
JPG, PNG or PDF, max 8 MB

Quotations are free and carry no obligation. * required.
We use your details only to answer this request. Privacy.
sourcing@alisios.co ·

Desalination in Egypt

Egypt operated 125 desalination plants with a combined capacity of 1.3 million m³/day, according to figures reported in September 2025. The government's plan is to reach 8.8 million m³/day by 2050.

Large state plants include East Port Said (150,000 m³/day, delivered in 2021 by Orascom Construction and Metito) and El Alamein (150,000 m³/day, completed in 2019 by FCC and Aqualia). In 2026 the Minister of Housing directed that plants above 10,000 m³/day be offered to private companies for operation and maintenance, naming Matruh, El Alamein, El Dabaa, Ras Sedr, El Tor, Dahab, Nuweiba, Abu Zenima, Sharm El-Sheikh, Arish and Al-Yusr in Hurghada.

Sources: Enterprise (21 Sep 2025) — Egypt's desalination plants, Enterprise (7 Jun 2021) — East Port Said plant, FCC (2 Aug 2019) — El Alamein plant, Zawya (2026) — Egypt to offer desalination plants for private O&M.

Equipment documented at Red Sea plants

PlantCapacityEquipment named by the manufacturer
Hilton Hurghada Plaza (retrofit 2019)1,000 m³/day1 Energy Recovery PX-Q300
Two Safa Water Technology plants, Hurghada (retrofit 2019)600 m³/day each2 Energy Recovery PX-260, replacing Pelton wheels
Plant built by Interwater, Hurghada (2015)1,800 m³/day3 Danfoss APP 26 pumps and 3 iSave 40 energy recovery devices

Sources: Energy Recovery (Nov 2024) — Hilton Hurghada Plaza case study, Energy Recovery (Oct 2024) — Hurghada retrofit case study, Danfoss — Hurghada case story.

In the Safa retrofit the operator reported that energy use fell from 6 kWh/m³ to 2.7 kWh/m³. The PX-260 belongs to Energy Recovery's 65 series, which we continue to quote: see ERI PX spare parts.

What we supply

Importing into Egypt: what we prepare

  • ACID number on the documents. Egypt's Advance Cargo Information (ACI) system applies to sea freight and, since 1 January 2026, to all air freight. The Egyptian importer requests the ACID number on the Nafeza platform; we put it on the invoice and it must appear on the air waybill.
  • Filing through CargoX. The shipping documents are filed electronically through CargoX before departure, at least 8 hours before the flight for air freight: invoice, packing list, certificate of origin and transport document.
  • Small urgent parcels. There is currently an exception for express shipments of up to 50 kg and USD 2,000 in value.
  • Payment. Documentary collection is accepted again: the Central Bank of Egypt decided in October 2022 to phase out the letter-of-credit-only rule. The payment method is agreed with each order.
  • Legalisation. Egyptian rules require consular legalisation of the invoice and certificate of origin in most cases. Tell us if your bank or customs agent asks for it, because it adds time.

These rules change. Check the current requirement with your customs agent before ordering.

Sources: Netherlands agricultural office (12 Feb 2026) — ACI for air freight to Egypt, US International Trade Administration (21 Nov 2025) — Egypt import requirements.

What we need to quote

  1. Model and serial number from the nameplate, or a photo of it.
  2. Manufacturer part number, if you have it.
  3. Quantity, and whether the plant is down.
  4. Delivery city and the name of the importing company.

Documents

  • Commercial invoice and packing list.
  • Distributor invoice or confirmation identifying where the part was bought.
  • Manufacturer's certificate of origin where the manufacturer issues one.
  • Photos of the parts and their labels before dispatch.
  • Air waybill (AWB) or bill of lading (B/L).

Have the equipment nameplate to hand?

Send a photo or the part number. We check the model and reply within 4 business hours.

Frequently asked questions

Do you supply spare parts for the ERI PX-260 in Egypt?

Yes. The PX-260 belongs to Energy Recovery's 65 series, and we continue to quote units, ceramic cartridges and seal kits for it.

Do you put the ACID number on the shipping documents?

Yes. The importer obtains the ACID number on Nafeza and sends it to us; it goes on the invoice and the air waybill, and the documents are filed through CargoX before departure.

Is a letter of credit required to import into Egypt?

No longer in all cases. The Central Bank of Egypt decided in October 2022 to phase out the rule and accept documentary collection again. The payment method is agreed with each order.

Do you supply resort plants on the Red Sea?

Yes. We quote Danfoss APP pump kits, energy recovery spares and membranes for small trains as well as parts for large plants.

Can you quote in Arabic?

Yes, in Arabic or English.

Get a quoteWhatsApp