Spare parts for seawater desalination plants in the Caribbean
Many Caribbean islands get most of their drinking water from seawater reverse osmosis. We supply genuine spare parts to utilities, plant operators and resorts across the region: pressure exchangers, membranes, pressure vessel parts and high-pressure pump kits.
WhatsApp: +34 655 099 909Updated: October 2026
Reply within 4 business hours.
Quotations are free and carry no obligation. * required.
We use your details only to answer this request. Privacy.
sourcing@alisios.co · WhatsApp
The installed base
| Plant | Capacity | Who runs it |
|---|---|---|
| Point Lisas, Trinidad (2002) | 40 million imperial gallons/day, about 182,000 m³/day | Desalcott, for the Water and Sewerage Authority |
| Point Fortin, Trinidad | 25,379 m³/day (6.7 MGD) | Seven Seas Water, for the Water and Sewerage Authority |
| Aruba | 48,000 m³/day of SWRO installed | WEB Aruba |
| Sint Maarten: Cay Bay, Cupecoy, Pointe Blanche | 23,900 m³/day (6.4 MGD) in total | Seven Seas Water, for GEBE |
| Red Gate 2, Grand Cayman (2024) | 2.64 million US gallons/day | Water Authority-Cayman |
| St. Thomas and St. Croix, US Virgin Islands | 7,570 and 5,677 m³/day | Seven Seas Water, for WAPA |
Sources: Business View Caribbean — Desalcott, Point Lisas, Seven Seas Water — Point Fortin, WEB Aruba — water production, Seven Seas Water — Sint Maarten, Consolidated Water — Red Gate 2, Seven Seas Water — US Virgin Islands.
Equipment documented at Caribbean plants
| Plant | Equipment | Stated by |
|---|---|---|
| Blue Hills, Nassau, Bahamas | Energy Recovery PX devices and AquaBold high-pressure pumps for an 18,500 m³/day expansion | Energy Recovery, 2011 |
| Red Gate 2, Grand Cayman | Energy Recovery isobaric energy recovery | Consolidated Water, 2024 |
| Luxury hotel, Jamaica | 2 Danfoss APP 38 pumps and 2 iSave 50 energy recovery devices; 1,800 m³/day | Danfoss, 2020 |
Sources: Energy Recovery (10 May 2011) — Blue Hills, Bahamas, Consolidated Water — Red Gate 2, Danfoss (5 Aug 2020) — hotel plant in Jamaica.
When Consolidated Water chose PX devices for Blue Hills, its vice-president said they work "without the need for regular maintenance or a large stock of spare parts". The parts that are needed, such as seal kits and, after many years, ceramic cartridges, are specific to the model and serial number.
What we supply
- Energy Recovery PX pressure exchangers: units, ceramic cartridges and seal kits; ERI turbocharger and pump spares.
- FilmTec and Toray seawater membranes, with interconnectors and seals.
- High-pressure pumps: Danfoss APP service kits, Sulzer and Flowserve spares, mechanical seals.
- Codeline pressure vessel parts and FEDCO turbocharger kits.
- Plants in hotels and resorts: see hotels and resorts.
Delivery to the islands
Urgent parts travel by air freight; membrane lots and complete units usually by sea. Each quotation states the Incoterm, the point of departure and the lead time confirmed with the source. Tell us whether you import directly or through a local customs agent, so the documents carry the right consignee.
What we need to quote
- Model and serial number from the nameplate, or a photo of it.
- Manufacturer part number, if you have it.
- Quantity, and whether the plant or a train is down.
- Island and delivery address.
Documents
- Commercial invoice and packing list.
- Distributor invoice or confirmation identifying where the part was bought.
- Manufacturer's certificate of origin where the manufacturer issues one.
- Photos of the parts and their labels before dispatch.
- Air waybill (AWB) or bill of lading (B/L).
Have the equipment nameplate to hand?
Send a photo or the part number. We check the model and reply within 4 business hours.
Related pages
Frequently asked questions
Do you ship desalination spare parts to Caribbean islands?
Yes. Urgent parts go by air freight and larger lots by sea. The quotation states the Incoterm, point of departure and lead time.
Which is the largest seawater desalination plant in the Caribbean?
Point Lisas in Trinidad, operated by Desalcott since 2002, produces 40 million imperial gallons per day, about 182,000 m³/day.
Do you supply parts for resort plants as well as utility plants?
Yes. We quote from a single pump service kit for a hotel plant to complete pressure exchanger units for a utility.
Which currency do you quote in?
US dollars or euros.